← All sample reports

Map: Town Centre Changes 1990 vs Now Report (Band 9)

Band-9 Task 1 map report on town-centre redevelopment, with urban-change vocabulary, demolished-converted-built grouping, and overview technique.

By Deep Bikram, IELTS Content Lead & Assessment Specialist · Reviewed by Sarah Chen · Updated

The maps show a town centre in 1990 and now. Summarize the information by selecting and reporting the main features.

A Band-9 model report

The maps chart a town centre's commercialization over three decades, as civic and green spaces yielded to retail and transit infrastructure.

Overall, the library, park, and town hall vicinity were redeveloped while the river and main road persisted. The centre shifted from civic-green character to shopping-transit function, with pedestrianization threading through.

Demolition cleared the old pattern: the central library was razed for a shopping mall, the western park gave way to a bus station, and rows of small shops along the high street were consolidated into a department store. Civic greenery largely vanished — the 1990 map's defining features.

Conversion adapted what survived: the town hall became a museum with its facade preserved, and the former post office now houses cafes at street level. The main road was pedestrianized between these anchors, creating a car-free spine lined with the new retail frontages.

New construction completed the transformation: a multi-storey car park rose behind the mall, and a train station extension linked the bus station into an interchange. Only the river's course and the outer ring road remain exactly as before — everything else was removed, repurposed, or raised anew.

(193 words)

Examiner notes: why Band 9

Task Achievement (9): Overview names the shift (civic-green to shopping-transit) with survivors noted. Changes triaged into demolished/converted/built — complete coverage, zero listing.

Coherence & Cohesion (9): Removed/repurposed/added sequence with spatial anchors. "Yielded," "threading," "anchors" sustain urban-change register.

Lexical Resource (9): Redevelopment precision: "commercialization," "razed," "consolidated," "pedestrianized," "car-free spine," "interchange." Exact verbs for each change type.

Grammatical Range & Accuracy (9): Passive for demolished/built, active for interpretation, parallel triple close. Clean.

High-scoring phrases

  • yielded to retail — giving way (precise verb)
  • razed — demolished (strong, formal)
  • civic-green character — old identity phrase
  • car-free spine — pedestrian axis image
  • frontages — building faces (technical term)
  • removed, repurposed, raised — triple-change close

Quick answers

Demolished, converted, built: how do I categorize changes?

Three buckets cover everything: removed, repurposed, added. Sort every change into one bucket and report bucket by bucket.

How do I handle unchanged features?

One sentence noting what survived: the river and main road remained. Stability reported once sharpens the contrast with everything that changed.

Master every chart type in the Task 1 samples library.


Our AI identifies exactly what is holding your score back and shows you how to fix it.